Project: Binswood Hall, Leamington Spa
Client: Architect
Location: Leamington Spa
Service: Elevations, Floor Plans and
Topographical Survey
|
|
|
| |
Client Requirements:
Client required a full site survey with particular emphasis on the Main Hall. The latter was built in the 1840's, is grade 2 listed and sits within a conservation area. Its’ Tudor revival style facades required fully detailed elevations.
Our Role:
Interlock surveys undertook the elevation surveys using remote survey instruments and photogrammetry. The technology and instruments used enabled us to link the internal surveys directly to the main survey network.
Client Benefits:
By using touch screen tablets, we were able to blue tooth the information to the survey equipments. This resulted in a substantial saving in both time to deliverables and cost for the client.
|
|
|
|